...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-26-2008, 12:34 PM
sacarguy sacarguy is offline
Senior Member
 
Join Date: Mar 2008
Posts: 201
Thanks: 0
Thanked 0 Times in 0 Posts
Default some more work on the 66 mustang

started in on some more work will be working on it very much in the next few weeks will prety much have some more pics every day.

here im cutting out the floor pans to replace the few rusty spots and at the same time installing a full 2x3 frame sliped inside the stock front frame and then welded to it and to the 2x3 crossmember for the four bar rear suspension wich is weded to the rear frame and the floor prety much giving me a full frame.






when im done ill cut the same chanel out of the new patch panels and weld them in to the floor pan and to the new frame rail and the old frame rail lip as well.

Last edited by sacarguy; 08-26-2008 at 12:42 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 05:11 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net