...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 09-21-2008, 09:45 PM
gearheads78's Avatar
gearheads78 gearheads78 is offline
Senior Member
 
Join Date: Feb 2007
Location: Dallas TX
Posts: 801
Thanks: 2
Thanked 2 Times in 1 Post
Default

And she inches closer

A little was done today got the dash, 4 speed pedals, and heater box together on the inside and the firewall mostly together on the outside. Also got the gas tank back in place. I then finished assembing the floor shift column I am converting to. Working with all the new painted areas today was pretty nerve racking. Not near a forgiving as the powder coating. Made a nick here and there but not anything anyone will even notice.

The last thing I was working on tonight was driveline angles. Ended up having to raise the back of the transmission 1/2" to get a 2.25* front and 2.5* rear working angle. Thanks go out to Andrew with the GTO for posting this link and talking about this in his build. It helped me figure it out quicky.
http://www.vibratesoftware.com/html_...aft_Angles.htm

I wanted to make sure that was done before I get the body back on. The last thing I need to raise the floor to clear the trans and then not have enough clearance to get the driveline right.





__________________
66 Cutlass "Joe-Touring"
54' Olds 88 "Joe-Touring 2.0"
69 SS Camaro 4-speed (wife's)

Richard J.
If only I had the time talent and money to build everything in my head
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 02:00 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net