...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 03-23-2009, 08:26 PM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,155
Thanks: 4
Thanked 30 Times in 19 Posts
Default C6-57 11 days till Del Mar.

Well I keep getting emails and phone calls on the C6-57 truck so I thought I would keep you guys posted as to the details and the progress for the next 11 days. So here is the gauge cluster, the center console with some stainless. I hope to get the shifter console installed tommorrow. I just sent the file to water jet the stainless. Plus the Door stiker bolts we made up.

Wait till you see the brake, clutch and gas pedals all done. Here is concept sketch from Solidworks. I'm waiting on the self lubricated Delrin rollers to mount the stainless sleeves to make the rollers for the gas pedal.
Attached Images
    
__________________
www.ironworksspeedandkustom.com
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:30 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright Lateral-g.net