...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-17-2010, 08:31 PM
bentfab's Avatar
bentfab bentfab is offline
Lateral-g Supporting Vendor
 
Join Date: Oct 2007
Posts: 762
Thanks: 0
Thanked 3 Times in 2 Posts
Default

Quote:
Originally Posted by Steve1968LS2 View Post
Well, it doesn't feel like it but progress is being made.

The underside is scraped and the new Wurth stuff should be on there by tomorrow.

With any luck I should be picking up the rearend housing from powder this week as well, then we can put the rear back together and get her rolling again. Found that he axle tubes were pretty warped from the 3-link brackets so Currie cut off the ends and welded on new ones.. straight.

Parts are moving for the 460 cube RHS LS engine, biggest delay will be the 4.250 Lunati crank which is two weeks out. That's the only delayed part though.

Cam selected is a 247/261 .624 114 LSA stick.. Any guess as to power?

Should be good to go for having the car done by April.. knock on wood.

The LM clutch is over at Centerforce getting refubed (figured I might as well since it's out)

The oil cooler system is also in progress getting all hard lined up. The Setrab 925 fits perfect. This is being done at Fast Eddies Fabrication in Orange, CA.

Do I smell compition ?
__________________
Follow us on Instagram = @bentcustom

www.bentcustomandperformance.com
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 09:50 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net