...

Go Back   Lateral-g Forums > Technical Discussions > Shop & Equipment
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 09-13-2010, 03:05 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,491
Thanks: 939
Thanked 342 Times in 231 Posts
Default Best day in a while !

This is a good day.
First thing this morning I called "my contractor". Boy it feels good to be able to say that! I told him he had the job, so we will get together to finalize everything. He's ready to start right away and so am I.
I went down to get the permit and was expecting something to go wrong scense everything else went so smooth. lol When I got to the building department there was one inspector, I hit the lottery, Nice guy. He looked over the application and helped me with some of the information I needed from there. Fifteen minutes later I was leaving with my permit.
It went so smooth I couldn't believe it. I can't wait to get started!
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 02:29 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net