...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-04-2011, 06:14 PM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,156
Thanks: 4
Thanked 35 Times in 21 Posts
Default

Well we are getting some things fit up to send the interior to Tracy and waiting for the 48 truck to be done at the painter before we send this epoxied body to the painter. We got the stereo set up and getting some interior things set up. Joe Ellis from Classic Wire is coming monday to work on the engine and interior wiring. We will get the AC hoses set up and installed next week. You can see how things were mounted under the dash and how the engine comaprtant is coming along.






__________________
www.ironworksspeedandkustom.com
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 10:21 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net