...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #26  
Old 01-14-2013, 08:17 AM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,156
Thanks: 4
Thanked 35 Times in 21 Posts
Default

I figured I would give you guys the latest update on what we have going. We have been slamming on all the details. We have the plumbing installed and have the exhaust built back to the fuel tank. I'm waiting on the Rick's Tank they custom built for this new chassis for us. It will bolt right in.


We are raising the drive shaft tunnel to clear the drive shaft at this ride height. This is how you know are cars sit like they should, LOW.


We installed the LED headlights that we sell in the car.


We set up the rear axle housing with the Standard equipment GMR housing we use.


We are in the middle of modifying the front inner fenders for our ride height and added tire width. We are only running a 295 front tire and the tire combo we have selected in a matched set.



Here is the latest progress on the dash. We have completed the back side of dash number 1. And getting ready to machine the front side.



Should be alot more to come as we get ready for the Grand National Roadster show.

Rodger
__________________
www.ironworksspeedandkustom.com
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 06:29 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net