...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #30  
Old 06-17-2013, 08:21 PM
Cris@JCG's Avatar
Cris@JCG Cris@JCG is offline
Senior Member
 
Join Date: Apr 2009
Location: Oxnard, CA
Posts: 1,915
Thanks: 0
Thanked 4 Times in 4 Posts
Default

Got a bit of progress today.. We slowed down a bit because we were waiting for the rear-end from Speedway Engineering to complete the floating axle ends.. Tomorrow we start the rear qtr panel flares.. got 50% of the mini-tubs done.. Got the radiator with fan in place.. Setrab coolers done! Got a bunch fiberglass pcs coming in from AAR..




__________________
Cris Gonzalez
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 07:48 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net