...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #25  
Old 07-07-2013, 10:30 AM
renegade6 renegade6 is offline
Senior Member
 
Join Date: Mar 2012
Location: Texarkana, TX
Posts: 132
Thanks: 0
Thanked 7 Times in 2 Posts
Default Primed and floors out

So, spent another day on the car. Finished up the priming, just enough to keep it from rusting, I will have to hit it again. I am really impressed with the SPI epoxy, it sprays on great and is so much easier to sand than some of the other epoxies I've used.

Braced up all of the car and cut the floors out. Also, removed all of the bracing on the package tray in preparation for the mini-tubs. Hope to get the mini tubs done next Saturday. In the interim, brought a door home to get it finished this week.

Goal is to have the car completely painted by the time I move next summer.
Attached Images
         
__________________
63 Biscayne
Schwartz Performance Chassis
Build thread: https://lateral-g.net/forums/showthread.php4?t=37302
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:19 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net