...

Go Back   Lateral-g Forums > Technical Discussions > Man Caves
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 12-19-2014, 11:14 AM
i c e b l u e i c e b l u e is offline
Junior Member
 
Join Date: Dec 2008
Posts: 3
Thanks: 0
Thanked 0 Times in 0 Posts
Default Sheldon's Garage

Hello everyone

I have been a lurker on this forum for years and gained a bunch of great ideas from this site. So I thought I would take the time to share some work of my own and hopefully inspire some people. I'm Just wrapping up some of the finishing touches on my garage. It doesn't hold a candle to some of the other sheds on here cough...Greg Weld...cough, but this is my first mancave so I have some time to catch up. Anyway, I figured I would share some the details that went into it.

To begin the the structure was already in place when I bought the property. A pretty basic but large 24' wide by 40' deep garage, with a standard 9' ceiling. With only electrical run to it.

Since then I have added

Heat and AC! (scored a residential furnace and AC unit off of CL)
1) ran natural gas line for furnace (rented a trencher fun stuff)
2) built a furnace room (keep the noise down and dust out)
3) Custom built plenum with baffles to allow/shut off heat/AC to either front or back of garage (to keep costs down if I am only using 1 side)
4) Attic duct work, insulated flexible 10" lines and vents (free from commercial tear down)
5) Insulation (scored free insulation from the commercial tear down enough for all the walls and blew in R50+ in the attic (more fun work)
6) Added accordion wall to separate front and back of garage (picked up at a garage sale)
7) industrial fan (garage sale find) to keep things cool when AC would be overkill

Compressed air
1) Built air compressor room (keep the noise down)
a) vented to outside
b) water drain plumbed to outside for easy draining
2) scored 60 gallon air compressor on CL
3) Ran schedule 80 PVC through attic to 2 above head hose reals and one terminal for blast cabinet

Lighting/electrical
1) 4 sets of T5 lights (broke down and bought new from home depot )
2) ran 240v to compressor and AC unit
3) ran outlets virtually everywhere (laid out tool floor plan ahead of time for locations)
4) Installed additional window for natural light (CL again)

Cosmetic
1) dry walled and taped everything (so much dust!)
2) epoxy floor
3) Frosted all windows to prevent unwanted onlookers

Functional
1) Installed a second exterior door to enter back half of garage (CL again)
2) kegoretor/ beer fridge (left on street had to fix AC leak and recharge)

Lift
1) Possibly the best CL score of the shop, wasn't planned but couldn't pass up the deal
a) ceiling is only 9ft so not ideal but still better than jack stands every time
b) had to make make holes in ceiling for upright cylinders, used PVC and capped tops(one actually goes through the roof but is flashed out and looks like a vent stack)

Special thanks goes out to my dad for helping me with all of the construction work, and to craigslist for all the bargains

cheers
Attached Images
         
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:19 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright Lateral-g.net