...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Open Discussion
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 04-12-2016, 10:51 AM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,156
Thanks: 4
Thanked 35 Times in 21 Posts
Default

Quote:
Originally Posted by cjsgarage View Post
Rodger, Blake: I admit that the numbers are low. There Re no doubt ancillary items that tag along. I usually like to redo the engine harness myself. That alone usually takes 16 hours to lay, sheath and cut to length/recrimp the ends.

I think that if you want it perfect, it's a billable hours deal. But I'm think I was more like Todd's answer in that this would get it set on the ground. It no doubt needs probably another two and a half weeks of work for rear end set up/driveshaft angles, underbody coatings or prep/paint, front end wiring, dash wiring, cage prep and paint, blah blah blah. Maybe more than two and a half weeks. I've never gotten a build of that scope done sooner than six months.

And I also tend to give stuff away. I guess I don't FEEL like it should take 32 hours to fit front sheet metal.. Even though I really did work at it for 32 hours--straight. Perhaps that's why I closed.
But I do work with a hustle, and did close my shop. Maybe I'll apply for work at Ironworks and Speedtech!! Well, now that I've kicked myself out the door, maybe not..
Yeap - it shouldn't take 32 hours until it really does.

Chip Foose can build cars on TV in a week right?
__________________
www.ironworksspeedandkustom.com
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 10:22 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net