...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #14  
Old 05-24-2016, 06:42 PM
aidanfancystang's Avatar
aidanfancystang aidanfancystang is offline
Member
 
Join Date: Sep 2012
Location: Calgary,AB
Posts: 92
Thanks: 2
Thanked 15 Times in 13 Posts
Default

Wow haven't posted in a while. Some things have been done. The mini tubs is finished the sub frames is back in and the paint stripped and body work started. I have the 9" cut down and the torque arm install started. I am hoping to get the power train back in soon as well.
Reply With Quote
The Following User Says Thank You to aidanfancystang For This Useful Post:
syborg tt (09-04-2018)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:39 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net