...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #26  
Old 07-06-2018, 06:49 AM
1970RT's Avatar
1970RT 1970RT is offline
Lateral-g Supporting Member
 
Join Date: Apr 2017
Location: Dallas, TX
Posts: 89
Thanks: 38
Thanked 48 Times in 42 Posts
Default

Continued progress building out the chassis.

Front and rear "torque boxes" are burned in and now one continuous structural member from front to rear. I took my time with setup and welding so everything stayed level and square. I'll wire-wheel and blend all the MIG welds later.

Next up is the front frame expansion - looking to make a stronger connection between the front rails and the torque boxes, improving rigidity, and transferring loading to the (not yet built) inner rails and rockers. There's a lot of pock marks in the frame, so I'm filling with my TIG and smoothing as I go.

David
Attached Images
       
Reply With Quote
The Following User Says Thank You to 1970RT For This Useful Post:
syborg tt (10-28-2019)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 05:53 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net