|
12-23-2020, 06:51 PM
|
|
Administrator
|
|
Join Date: Jul 2004
Location: Wilton, CA.
Posts: 12,876
Thanks: 5,301
Thanked 1,570 Times in 699 Posts
|
|
Only took 3 hours to get the second tub in, took some shortcuts after doing the first side. I still have some welding to do so they're not 100% finished, but they're at least in place.
While I'm waiting on the front drive so I can finish the mods to the turbo hot side I started fitting my tunnel piece from Bowler. I'll get all the pics posted up as I complete it. I did order a steam line kit from Motion Raceworks, love the look and fit.
|
The Following 4 Users Say Thank You to camcojb For This Useful Post:
|
|
Tags
|
70 chevelle, aeromotive, american powertrain, amsoil, baer brakes, borgeson, clayton machine, currie, dakota digital, eddie motorsports, forgeline, holley performance, hydratech, ididit, lateral-g, lokar, magnaflow, mcleod racing, mighty mouse solutions, modo innovations, morris classic concepts, painless performance, protouring, restomodair, roadster shop, rock valley antique auto parts, ron davis, texas speed, thermotec, tmi products, vintage air |
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -5. The time now is 08:24 AM.
|