...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #22  
Old 01-02-2025, 11:37 AM
HEEP's Avatar
HEEP HEEP is offline
Senior Member
 
Join Date: Dec 2008
Location: Chattanooga, TN
Posts: 571
Thanks: 14
Thanked 182 Times in 75 Posts
Default

I am still at it. Seems like every time, I think I am done with metal work, I see something else that needs completed.

Waiting on a Trans tunnel metal to be bent, and that should finish up every thing.

Time though is not always a friend.

Thanks for looking.

Bill
__________________
Bill

My Build Thread;

https://lateral-g.net/forums/showthread.php4?t=40557
Reply With Quote
The Following User Says Thank You to HEEP For This Useful Post:
syborg tt (01-05-2025)
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 08:10 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net