...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Open Discussion
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 10-18-2007, 04:15 PM
akrapovic's Avatar
akrapovic akrapovic is offline
Senior Member
 
Join Date: Jul 2007
Location: The glove
Posts: 313
Thanks: 1
Thanked 4 Times in 4 Posts
Default

LOL. Still waiting, but I guess that's the name of the game. Doesn't seem real reasonable to me to take 7 days to do finish a catback exhaust. I was told by a friend that the shop moves SLOOWWWW but it's getting a little ridiculous. Live and learn.
Reply With Quote
  #2  
Old 10-19-2007, 12:35 AM
COYBILT's Avatar
COYBILT COYBILT is offline
Senior Member
 
Join Date: Oct 2007
Location: modesto,ca
Posts: 646
Thanks: 1
Thanked 3 Times in 2 Posts
Default

I started on my car in june of 06 I wont be done till april or june of 08. It takes time to build these cars. When it is all done you can have a great time with the car and the whole build process will just be a subtle memory.
__________________
1965 GTO convertible
2009 GM Design Award winner
Triple black with Subtle yet massive Modifications.
Reply With Quote
  #3  
Old 10-19-2007, 03:18 AM
Spiffav8's Avatar
Spiffav8 Spiffav8 is offline
Lateral-g Moderator
 
Join Date: Apr 2007
Location: Las Vegas, NV
Posts: 4,748
Thanks: 591
Thanked 473 Times in 227 Posts
Default

Quote:
Originally Posted by akrapovic
LOL. Still waiting, but I guess that's the name of the game. Doesn't seem real reasonable to me to take 7 days to do finish a catback exhaust. I was told by a friend that the shop moves SLOOWWWW but it's getting a little ridiculous. Live and learn.

That does seem like a long time. Then again any time the car is being worked on seems to take to long.
__________________
Curtis
Pilots: We're not better than you, just way cooler.

NO ONE IS COMING. IT'S UP TO US.

http://www.navysealfoundation.org/
Reply With Quote
  #4  
Old 10-19-2007, 08:20 AM
ArisESQ ArisESQ is offline
Senior Member
 
Join Date: Aug 2005
Location: Los Gatos
Posts: 765
Thanks: 8
Thanked 10 Times in 9 Posts
Default

Just curious, but what is the labor for? 55 hours to install the T56 and the 4-link?
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 09:07 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net