Once we are done with the fab work on Larry's car it will go back to Franks and another is coming here. It is getting a Warhawk LS engine and the headers will be fabbed up on it. Hopefully in about 3-4 weeks or so. Thanks for the interest.
Here's the driver's side ready for waste gate fabrication. I'm expecting Larry's material tomorrow (flanges and 321 1.5" tube), so Mike and I can get the rest of the exhaust done and Larry's car back over to Frank's place for suspension, body/paint, and interior.
I'll post some more pics of the waste gate as it unfolds.
Sorry for the small size... 161K seems to be as big as I can upload. I'll try again with a linked image.