...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #19  
Old 05-27-2011, 07:54 AM
240RR 240RR is offline
Member
 
Join Date: Mar 2011
Posts: 35
Thanks: 0
Thanked 0 Times in 0 Posts
Default

[IMG][/IMG]

Got a start on the chassis jig yesterday and pretty darn pleased with it so far. I have four bolt adjusters on the legs. I wanted to do minimal welding on the two beams so built the supports this way. I have to do a couple cross supports but I may just bolt some angle iron on each end where there already holes...to save welding and risking deforming the beams.
Have to do leg braces yet also...
I like the notches in the beams...a 2x4 fits in perfectly for quick cross supports. Also will see if I can pick up some 1-1/2" tubing I can tack in place.
I left the supports a little long and set them both at the centerline of the wheelbase...figure that might come in handy for placing the jigs for the uprights.

Last edited by 240RR; 05-27-2011 at 08:04 AM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 07:22 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net