...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 06-04-2011, 09:48 PM
wrp's Avatar
wrp wrp is offline
Senior Member
 
Join Date: Jul 2010
Location: Plano Texas
Posts: 240
Thanks: 0
Thanked 1 Time in 1 Post
Default

Thanks, quite a bit done today. Finalized the electrical system setup with the rear moutned battery. We should have that in in a couple of weeks. The welder finished most of the valve covers and the evac system. Also got the water pump bracket roughed in. Going to mount it along the passenger side frame rail where the battery came out using battery tray holes. Running the outlet down through the frame and bending it 90 degrees into the engine compartment.









Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 08:49 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net