...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #28  
Old 01-05-2012, 09:20 AM
GaryBetsy GaryBetsy is offline
Member
 
Join Date: Oct 2011
Location: Hamilton, NJ
Posts: 25
Thanks: 0
Thanked 0 Times in 0 Posts
Default Project Updates and Pictures as of 1/5/11

Hey everyone in this next set of updated build photos you can see that after we locked in the location of the hood and front end sheet metal we continued with fabrication of the front tubing structure. We bent it all out of .120 wall DOM tubing and fabricated frame stand offs out of 1/8" plate. Here are a few of the pictures of us getting the structure all tacked together. Take a look and tell us what you think.
Attached Images
        
__________________
Gary Betsy
GB Performance Restorations
275 Rt. 156 Hamilton, Nj 08620
(609) 581-1800

Last edited by GaryBetsy; 01-05-2012 at 09:24 AM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 07:37 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net