Angry Damn contractors!

What is it with contractors in Massachusetts? Granted I'm in a different part of the state, but I remember reading when WaynieZ was going through all his problems getting a contractor.

I called my first contractor back before the winter. He came out measured and never called back. I called and left a message with another about a month ago and no return phonecall.

I had a friend of mine (has his own structural engineering firm) contact one of his clients and all I got back was a secondhand email, saying that he didn't quite understand what I was looking for, but he still managed to give me what I thought was an outrageous price.

I actually called back my original guy last week (who is a friend by the way) and left a message. No return phonecall

I called another one that I know is reputable and he was supposed to come by today. Well, if he came by I don't think I would have started this thread. Doesn't anybody want work? I thought the econony sucked and no one was spending money so all these contractors are supposed to be hurting?

I'm still holding out hope for today's guy. I am optomistic he will come by tomorrow, but at the same time I know a sucker is born every minute
__________________
TJ Ragucci

http://www.northeastrodrun.com/
Reply With Quote
  #2  
Old 02-16-2012, 09:20 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,491
Thanks: 939
Thanked 342 Times in 231 Posts
Default

You just gave me a chill thinking back. BRRRRRR! It sucks but ahng in there.
Good luck tomorrow.
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK
Reply With Quote
  #3  
Old 02-16-2012, 09:32 PM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

If a guy doesn't do what he SAYS he's going to do ---- what kind of a job do you think you'd get for your money.

There's good contractors out there -- you just need to find one.


Tuesday at 2:00 is Tuesday at 2:00.... not Wednesday "maybe".
Reply With Quote
  #4  
Old 02-16-2012, 09:51 PM
Sieg's Avatar
Sieg Sieg is offline
Moderator
 
Join Date: Dec 2010
Location: Pacific Northwet
Posts: 8,034
Thanks: 33
Thanked 99 Times in 41 Posts
Default

What's the scope and scale of the work? Reading between the lines one could assume they may be perceiving the project as more of a liability than opportunity?
Reply With Quote
  #5  
Old 02-16-2012, 10:31 PM
Northeast Rod Run's Avatar
Northeast Rod Run Northeast Rod Run is offline
Senior Member
 
Join Date: Jan 2008
Location: Massachusetts
Posts: 363
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by Sieg View Post
What's the scope and scale of the work? Reading between the lines one could assume they may be perceiving the project as more of a liability than opportunity?
Pretty simple and straight forward stuff.

Somewhere between a 16' or 24' wide by 28' deep addition to the side of an existing garage. Keeping exact same roofline so there is no extra stuff there. Only need to put up three walls and take down the existing wall from the original garage. Pour a 4' foundation (code) and concrete floor. No electrical or interior work needed. All setbacks have plenty of room and no need for any variances and on a level lot
__________________
TJ Ragucci

http://www.northeastrodrun.com/

Last edited by Northeast Rod Run; 02-16-2012 at 10:33 PM.
Reply With Quote
  #6  
Old 02-16-2012, 10:40 PM
Sieg's Avatar
Sieg Sieg is offline
Moderator
 
Join Date: Dec 2010
Location: Pacific Northwet
Posts: 8,034
Thanks: 33
Thanked 99 Times in 41 Posts
Default

Quote:
Originally Posted by Northeast Rod Run View Post
Pretty simple and straight forward stuff.

Somewhere between a 16' or 24' wide by 28' deep addition to the side of an existing garage. Keeping exact same roofline so there is no extra stuff there. Only need to put up three walls and take down the existing wall from the original garage. All setbacks have plenty of room and no need for any variances and on a level lot
Possible building permit issues?

Being in the floor covering business most my life in the Northwest I've dealt with the same "uncomprehendable" issues. Sometimes (20%) there's justifiable reasons, it's the 80% that's very frustrating.

Maybe try a local well established contrator supply business (not big-box Home Depot/Lowes) for a local contractor referal, they're naturally motivated to provide work for their better customers. Your local building permit department may also be a source.
Reply With Quote
  #7  
Old 02-16-2012, 10:26 PM
Northeast Rod Run's Avatar
Northeast Rod Run Northeast Rod Run is offline
Senior Member
 
Join Date: Jan 2008
Location: Massachusetts
Posts: 363
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by GregWeld View Post
If a guy doesn't do what he SAYS he's going to do ---- what kind of a job do you think you'd get for your money.
I hear ya. At this point I'm not really looking for any of these guys to be my final contractor. I'm just looking for price points, so when I get a decent guy I'll know a little better about the final figures

The way I always look at anything that I purchase (be it goods or services), is that if you have a hard time getting a hold of them just to give them your money, how much harder is it going to be, if you have problems later, once you have already paid them?
__________________
TJ Ragucci

http://www.northeastrodrun.com/
Reply With Quote
  #8  
Old 02-17-2012, 04:10 PM
Northeast Rod Run's Avatar
Northeast Rod Run Northeast Rod Run is offline
Senior Member
 
Join Date: Jan 2008
Location: Massachusetts
Posts: 363
Thanks: 0
Thanked 0 Times in 0 Posts
Default

One guy finally came by today and i only talked to him last week, but then again he is a friend. He already said he can't even think about touching it until mid-summer, but that is ok by me because I'm trying to pay cash for almost all of it and that just gives me more time to save.

I've told guys that I don't have plans yet, but they say it doesn't matter to them. Some said that they wanted to come by first to see the lot anyway. That way when they get the plans they already know the site. A couple of them have even said that they don't need any because they have their own software that they generate plans from.
__________________
TJ Ragucci

http://www.northeastrodrun.com/
Reply With Quote
  #9  
Old 02-17-2012, 04:26 PM
Track Junky's Avatar
Track Junky Track Junky is offline
Senior Member
 
Join Date: Apr 2010
Posts: 3,469
Thanks: 2
Thanked 12 Times in 7 Posts
Default

Quote:
Originally Posted by Northeast Rod Run View Post
I've told guys that I don't have plans yet, but they say it doesn't matter to them. Some said that they wanted to come by first to see the lot anyway. That way when they get the plans they already know the site. A couple of them have even said that they don't need any because they have their own software that they generate plans from.

No, it doesn't matter to them but they didn't come running over to take a look though did they. I gaurantee if you had an approved set of plans they would be alot more inclined to pay you a visit.
__________________
Gaetano Cosentino
Reply With Quote
  #10  
Old 02-19-2012, 03:47 PM
waynieZ's Avatar
waynieZ waynieZ is offline
Lateral-g Supporting Member
 
Join Date: Oct 2006
Location: Ma
Posts: 8,491
Thanks: 939
Thanked 342 Times in 231 Posts
Default

Even with plans they don't always come. I gave a copy of stamped plans to a contractor and he still has them a year after it got built. we played phone and going to his current site tag, nothing ever came of it. I was also told if you pull the permit the contractor can leave the job while not complete. But if he pulls it he is responsible for it. You'll know when you talk to the right guy he will be interested and be in contact with you in an acceptable time frame..
__________________
_Wayne________

___________________________________
https://lateral-g.net/forums/show...ghlight=FNQUIK
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:20 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net