|
|

12-18-2013, 03:07 AM
|
 |
Senior Member
|
|
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
|
|
|

12-18-2013, 07:08 AM
|
 |
Lateral-g Supporting Member
|
|
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
|
|
So how many hours of welding do you have "accounted for"?
Just asking.
|

12-19-2013, 12:34 AM
|
 |
Senior Member
|
|
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
|
|
Quote:
Originally Posted by GregWeld
So how many hours of welding do you have "accounted for"?
Just asking.
|
I haven't kept exact count on this one as its the first of the Chevy Truck frames but its taking a lot longer just because of all the photos I've been doing. For every photo I post I delete 5-10. But I was pondering this question a little while back and here's the little bit I timed just to get an idea. The box for the control arms to the frame that I installed just before I put the front on the frame. The one side I photographed the build of took me 7 hours. The second one took 1 hour and 50 minutes and I basically only weld at night to keep people from bothering me so mostly uninterrupted (you answer the girlfriends calls).
I would guess I have 22-25 hours in the frame right now with another 4-10 to finish it all up.
Keep in mind our shop is only 2 guys most of the time with 2 part time guys who help out and do body work on the shop projects. We've been building a TriFive stage 4 chassis, boxing up 6 other frames, run a powder coating business and my father (the other full time guy), he's going in for back surgery next month for a slipped vertebra so take a guess how useful he is right now. I wish I had the time to just bang this frame out but we need to support the customers who have already purchased their own TriFive frames. I will timelaspe the next frame (I have another in a crate to weld up) and clock it at the same time. With luck we'll have a dozen clocks on the set and you can see them all ticking along to get a feel for the time as well.
Later
-Russell
|

12-19-2013, 09:30 AM
|
 |
Lateral-g Supporting Member
|
|
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
|
|
Yeah --- I was thinking maybe 60+ hours start to finish. MIG would be way faster… but not as nice. Well that's a debatable statement so I probably shouldn't even type it.
Sorry 'bout your Dad -- back issues suck!
|

12-19-2013, 10:52 AM
|
 |
Senior Member
|
|
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
|
|
Quote:
Originally Posted by GregWeld
Yeah --- I was thinking maybe 60+ hours start to finish. MIG would be way faster… but not as nice. Well that's a debatable statement so I probably shouldn't even type it.
Sorry 'bout your Dad -- back issues suck!
|
Thanks, I'm just happy he's not going to be in such pain anymore. Watching the man you looked up to get old and slow down is tough but after the pre surgery physical the doctor described him as "exemplary condition" and I know his tolerance for pain in amazing so it'll be interesting to see how he is after it stops pinching his nerve and he can walk for more than 5 minutes at a time.
MIG has is advantages in certain places as does the TIG but I told the customer I would TIG this whole frame so I am. Ideally for production I'll MIG most of your 90° corners and lots of the heavy plate at the back of the frame. I would say start to finish a first timer would have 50-60 if they didn't have that many clamps, prep time and going back and forth between the video. A shop should be able to bag it out in under 20. I just dropped one of the 3 frames off with a friends shop so we'll see how long it takes him granted he'll be modifying his for a C10.
Later
-Russel
Last edited by rat_rod_russell; 12-19-2013 at 10:55 AM.
|

12-20-2013, 04:32 PM
|
|
Lateral-g Supporting Member
|
|
Join Date: Nov 2008
Location: Dunwoody, GA
Posts: 6,592
Thanks: 1,629
Thanked 883 Times in 659 Posts
|
|
That looks fantastic! Well worth the effort I'd say.
__________________
Trey
Current rides: 2000 BMW 540i/6 and 86 C10.
Former ride: 1979 Trans Am WS6: LT1/T56, Kore 3 C5/6 brakes, BMW 18in rims
|

01-22-2014, 07:43 AM
|
 |
Senior Member
|
|
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
|
|
|

12-20-2013, 05:22 PM
|
 |
Lateral-g Supporting Member and Moderator
|
|
Join Date: Oct 2007
Location: On Lake Ontario in NY
Posts: 11,264
Thanks: 3,461
Thanked 3,743 Times in 2,222 Posts
|
|
Congrats on the progress Russell.
__________________
Skip
|

01-19-2014, 06:29 AM
|
 |
Senior Member
|
|
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
|
|
Thanks all!
Sorry I've been out of touch. Holidays, TIG died, had to help the girlfriend move, Jim (aka dad, works here with me) had back surgery and we had a TFC4 TriFive C4 Stage 4 Chassis to wrap up. But no relatives were murdered, the TIG has been fixed, girlfriend is moved in, Jim doesn't have any of the pain he's had in his legs and was walking again same day after the surgery and the Stage 4 Chassis is awesome!
I'm almost done with the truck frame. I didn't bother doing extensive photography in favor for speed. It was all just little bottom welding and a few loose brackets but I'll get few photos posted in a day or two I hope.
The rest of the photos are here.
http://www.trifive.com/forums/showth...87#post1282187
Later
-Russell
|
| Thread Tools |
|
|
| Display Modes |
Hybrid Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
All times are GMT -7. The time now is 05:43 PM.
|