...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 12-19-2013, 09:30 AM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,080 Times in 388 Posts
Default

Yeah --- I was thinking maybe 60+ hours start to finish. MIG would be way faster… but not as nice. Well that's a debatable statement so I probably shouldn't even type it.

Sorry 'bout your Dad -- back issues suck!
Reply With Quote
  #2  
Old 12-19-2013, 10:52 AM
rat_rod_russell's Avatar
rat_rod_russell rat_rod_russell is offline
Senior Member
 
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
Default

Quote:
Originally Posted by GregWeld View Post
Yeah --- I was thinking maybe 60+ hours start to finish. MIG would be way faster… but not as nice. Well that's a debatable statement so I probably shouldn't even type it.

Sorry 'bout your Dad -- back issues suck!
Thanks, I'm just happy he's not going to be in such pain anymore. Watching the man you looked up to get old and slow down is tough but after the pre surgery physical the doctor described him as "exemplary condition" and I know his tolerance for pain in amazing so it'll be interesting to see how he is after it stops pinching his nerve and he can walk for more than 5 minutes at a time.

MIG has is advantages in certain places as does the TIG but I told the customer I would TIG this whole frame so I am. Ideally for production I'll MIG most of your 90° corners and lots of the heavy plate at the back of the frame. I would say start to finish a first timer would have 50-60 if they didn't have that many clamps, prep time and going back and forth between the video. A shop should be able to bag it out in under 20. I just dropped one of the 3 frames off with a friends shop so we'll see how long it takes him granted he'll be modifying his for a C10.

Later
-Russel
__________________
PT-57
1957 Chevy Truck, 6.0L LS, T56, STS Twin Turbos, C6 Corvette Suspension, CAD Designed Frame by Hot Rod Jim's.
https://lateral-g.net/forums/showthread.php4?t=20292

http://www.nerdrods.com

Last edited by rat_rod_russell; 12-19-2013 at 10:55 AM.
Reply With Quote
  #3  
Old 12-20-2013, 04:32 PM
WSSix WSSix is offline
Lateral-g Supporting Member
 
Join Date: Nov 2008
Location: Dunwoody, GA
Posts: 6,592
Thanks: 1,629
Thanked 883 Times in 659 Posts
Default

That looks fantastic! Well worth the effort I'd say.
__________________
Trey

Current rides: 2000 BMW 540i/6 and 86 C10.

Former ride: 1979 Trans Am WS6: LT1/T56, Kore 3 C5/6 brakes, BMW 18in rims
Reply With Quote
  #4  
Old 01-22-2014, 07:43 AM
rat_rod_russell's Avatar
rat_rod_russell rat_rod_russell is offline
Senior Member
 
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
Default

And the photos!









Now for some suspension

-Russell
__________________
PT-57
1957 Chevy Truck, 6.0L LS, T56, STS Twin Turbos, C6 Corvette Suspension, CAD Designed Frame by Hot Rod Jim's.
https://lateral-g.net/forums/showthread.php4?t=20292

http://www.nerdrods.com
Reply With Quote
  #5  
Old 01-22-2014, 09:37 AM
ChuckDriver's Avatar
ChuckDriver ChuckDriver is offline
Senior Member
 
Join Date: Jun 2012
Location: Charleston, SC
Posts: 109
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Looks great Russell! I'm calling "Shotgun" for the first ride!!
__________________
JJ

My 1957 project:

http://67-72chevytrucks.com/vboard/s...d.php?t=334552
Reply With Quote
  #6  
Old 01-22-2014, 10:30 AM
Hotrod1's Avatar
Hotrod1 Hotrod1 is offline
Member
 
Join Date: Jan 2011
Location: Thousand Oaks, California
Posts: 100
Thanks: 0
Thanked 0 Times in 0 Posts
Default

well if the purpose you are showing us the frame is to make us think that it is a great looking frame, well engineered, reasonable to put together, well thought out, make me want to have one, ..... then it is working.
Reply With Quote
  #7  
Old 01-24-2014, 08:44 AM
rat_rod_russell's Avatar
rat_rod_russell rat_rod_russell is offline
Senior Member
 
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
Default

Quote:
Originally Posted by Hotrod1 View Post
well if the purpose you are showing us the frame is to make us think that it is a great looking frame, well engineered, reasonable to put together, well thought out, make me want to have one, ..... then it is working.
Goooooooood (insert evil laugh)

Not pretty parts but its rolling. I need to get something together for a temp coil over shock and then its time to bring the cab in. It just got really cold down here but we'll be back to normal shortly. I need the stage 4 on the lift to go away and I'm working on the wiring harness to the 38 Ford in the background as well and I need to finish that to bring the Cab and front clip in to mount up. Hopefully that will happen Tuesday or Wednesday of next week.





__________________
PT-57
1957 Chevy Truck, 6.0L LS, T56, STS Twin Turbos, C6 Corvette Suspension, CAD Designed Frame by Hot Rod Jim's.
https://lateral-g.net/forums/showthread.php4?t=20292

http://www.nerdrods.com
Reply With Quote
  #8  
Old 12-20-2013, 05:22 PM
fleetus macmullitz's Avatar
fleetus macmullitz fleetus macmullitz is offline
Lateral-g Supporting Member and Moderator
 
Join Date: Oct 2007
Location: On Lake Ontario in NY
Posts: 11,264
Thanks: 3,461
Thanked 3,743 Times in 2,222 Posts
Default

Congrats on the progress Russell.
__________________
Skip
Reply With Quote
  #9  
Old 01-19-2014, 06:29 AM
rat_rod_russell's Avatar
rat_rod_russell rat_rod_russell is offline
Senior Member
 
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
Default

Thanks all!

Sorry I've been out of touch. Holidays, TIG died, had to help the girlfriend move, Jim (aka dad, works here with me) had back surgery and we had a TFC4 TriFive C4 Stage 4 Chassis to wrap up. But no relatives were murdered, the TIG has been fixed, girlfriend is moved in, Jim doesn't have any of the pain he's had in his legs and was walking again same day after the surgery and the Stage 4 Chassis is awesome!



I'm almost done with the truck frame. I didn't bother doing extensive photography in favor for speed. It was all just little bottom welding and a few loose brackets but I'll get few photos posted in a day or two I hope.


The rest of the photos are here.
http://www.trifive.com/forums/showth...87#post1282187

Later
-Russell
__________________
PT-57
1957 Chevy Truck, 6.0L LS, T56, STS Twin Turbos, C6 Corvette Suspension, CAD Designed Frame by Hot Rod Jim's.
https://lateral-g.net/forums/showthread.php4?t=20292

http://www.nerdrods.com
Reply With Quote
  #10  
Old 01-20-2014, 12:39 PM
rat_rod_russell's Avatar
rat_rod_russell rat_rod_russell is offline
Senior Member
 
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
Default

BAM



real photos coming soon

-Russell
__________________
PT-57
1957 Chevy Truck, 6.0L LS, T56, STS Twin Turbos, C6 Corvette Suspension, CAD Designed Frame by Hot Rod Jim's.
https://lateral-g.net/forums/showthread.php4?t=20292

http://www.nerdrods.com
Reply With Quote
Reply

Tags
corvette, pickup, suspension, truck, weld

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 06:35 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net