Time for a new floor pan. I put in the full 74 and earlier pan.
New complete floor pan is in, DSE firewall filler panel is being welded in, new toe kicks are in, subframe connectors are tacked in place and the DSE mini-tubs are going in now.
Tubs are in.
Toe kicks are in.
Full floor is in.
Firewall panel is in
DSE sub frame connectors, cut and tacked in place waiting to mate new sub-frame.
Upper and lower tubular control arms and springs are mounted to freshly powder coated sub-frame
The DSE sub-frame connectors and tubs are fully welded in and the bottom of the car was sprayed with some Kevlar infused 2K bed liner. The owner of the body shop came by the house to do it while it was still on the rotisserie. Also put in DSE body mounts.
Jambs and firewall are painted. Three trips to the paint store to finally make sure they got the paint right! Both top and bottom of new floor and sub-frame connectors have been sprayed with bed liner.
[img width=800 height=600]http://i213.photobucket.com/albums/cc231/dcamburn/1979%20Trans%20Am%20-%20Blue/null_zpsd55b63cb.jpg[/img]