...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #32  
Old 12-05-2017, 03:07 PM
TCI Engineering's Avatar
TCI Engineering TCI Engineering is offline
Member
 
Join Date: Feb 2017
Posts: 73
Thanks: 1
Thanked 12 Times in 8 Posts
Default

Still plugging away on the center section. Built the main tranny hoop and tied it in with some downbars. It is just tacked in place at this time. I still need to throw the cab back on to confirm placement. It'll make sense why the tubes are on top of the frame once the cab is back on.



I still need to make a couple tabs to close out the round tube on top of the frame.



The rear tube placement must be 21" behind the front one to fit properly. I plan to tie the driveshaft loop, tranny mount and Torque Arm mount all together in that area.

__________________
www.totalcostinvolved.com "Quality doesn't cost, it pays"
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 03:42 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net