Ok lets get up to speed on the last few weeks. I finished up the driver side brake and trans cooler duct.







The engine came back from the machine shop and I'm ready to assemble it once I get a few more bolts and bearings ordered. I still don't know what cam I want to go with either. I started working on the supercharger cover by grinding down the Corvette letters and back filing them with panel bond. On the center console I stared to fiberglass the gap until I ran out of glass. The cover and console are coming along nicely tho.






Most importantly I finally got some epoxy shot on the inner structure and have started the final fitment and welding of the quarters. It took a lot longer then I figured it would to get everything fit and mostly welded up. I still have more welding to do across the top and back before I can grind the welds and start the hammer and dolly process. Big step forward to having a whole car again tho.


__________________
Instagram- camaroaj
Reply With Quote
The Following 5 Users Say Thank You to CamaroAJ For This Useful Post:
camcojb (06-20-2021), Che70velle (06-21-2021), dhutton (06-21-2021), EVIL SS (06-23-2021), Roscoe03 (06-21-2021)
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 02:37 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net