Quote:
Originally Posted by Steve1968LS2
Tomorrow we bolt in the LS2 and T56 and start the process of getting her running. Should take 4-5 days for all the systems then back to BOS to get the front sheetmetal re-hung.
Yesterday we finished up the LD 3-link and the brakes.. the results:

|
Steve,
I am a three link dummy, so please forgive me. Why so much coil adjustment on the left vs. right. A function of the left Watts link being on top?
Beautiful setup! Way above scrub line for all the worriers out there.
Thanks,
BT