Quote:
Originally Posted by glassman
If it is, (and most around here are not, cept trac housing), You almost CAN NOT drill into it, you knick one of those cables (installing a lift or anything else bolted down) and you can die, very easily.
I recommend bolting almost everything here in Cali, u dunno when the fat lady's crack is gonna fart. When it does, racks are falling over.
|
I think you're right Mike. Talked to my 2 buddies helping me on this last night .. they assume it will be conventional rebar but will defer to the engineer on that.
And the 2 post lift will most certainly be bolted down in these parts.
Quote:
Originally Posted by DBasher
Save your tool budget and do a couple sliders and a deck over the parking area. You’ll end up using it more, cussing less and the risk of injury will be drastically reduced.
Just sayin
|
Guess you missed the part where the in-law above is the priority. Added parking and a lift underneath just come with the package.
If we're gonna spend the money to excavate it only makes sense to do 2 floors since my zoning allows 27 foot height and 6000 total square feet.
This is also part of a long term (15-20 year) plan to position this property for ultimate resale when our gets get done with high school. Our lot is large for here (3/4 acre) and the house has a large but compartmentalized choppy floor plan IMO. With this addition and a later MBR addition in maybe 5-10 years I think this will be much more desirable to a modern buyer in our area.
Quote:
Originally Posted by ADY
With rents being so high in the Bay Area, for resale or down the road you might think of squeezing another bedroom where the kitchen area is currently located since the space is so big. Then move the kitchen to the main rec room wall adjacent to the new bedroom, that way you won't run into biggier remodel down the road with moving the bay window and plumbing if you decide to do it.
I acted as the GC for my foundation replacement and buildout of our basement, total pain in the ass, but worth the $50k in savings. Only advice is have a solid contract with your subs and ensure it details the scope, materials, etc. Also, you can save a bit more by paying for material directly (concrete, rebar, lumber, etc), but you'll go crazy running to the lumber yard or paying for last minute deliveries.
For the garage, plumb air lines from you compressor to the ceiling/wall near your lift so you minimize tripping hazard. Also, don't skimp on the lighting of course.
|
We will never rent out this space. I like my tenants AWAY from my family.
Friends and family only. It isn't being permitted for occupancy either (rec room only). I wanted a huge open loft style room like my old lofts when I lived in the city. And the large windows and vaulted ceiling will match the existing house. When my parents and in-laws aren't staying there (short term only) this will be used as a poker room, for parties, etc. and the kids can sleep in peace in the main house.
I am with you on the GC part. I figure it will be a hassle but look forward to it. I will offer to do whatever I can (materials, etc) to save money and stay involved. Did that with our kitchen remodel and saved a ton.
One thing I already have is 14 or 15 hanging 4 foot LED lights. Dad got them for me on sale at Costco a couple years ago.
I don't have a big compressor and not sure when I will get one. But I do have a provision for an enclosure along the wall or next to the bathroom should I want to add one at some point.
But you have me thinking maybe I will make that over in the opposite corner closer to the list. Will have to think on that.
Thanks for the tips!