I say hallelujah . We have permenant power!
The electrician showed up at 8:15 and killed the temporary power at the meter. Then he went downstairs in the cellar and connected the power from the panel in the garage and seperated the whites from the neutrals in the house panel. The power company showed up and changed the power from the temp pole to the mast on the garage and installed the meter. The electrician put the cover on the panel in the garage and they were done. All before 10:00 am
The inspector showed up later in the day and passed it, so we're golden!
When the power company truck showed up the sun came out and the clouds split like the parting of the red sea.
I have an appointment for Friday morning to install the gutters and down pipes. If it doesn't snow. Them the door guys is coming in the afternoon ot install the highlift tracks and the Liftmaster 3800 opener. That should get me to where I can call for the building inspector to come check it out.
Here are a few pictures.
Plenty of room for expansion!
And the new meter.

My wife is already asking when I'm taking the temp power pole down. Not in too much of a rush. lol