  #21  
Old 05-08-2012, 01:20 PM
Vince@Meanstreets's Avatar
Vince@Meanstreets Vince@Meanstreets is offline
Senior Member
 
Join Date: Nov 2004
Location: Bay Area, California
Posts: 5,532
Thanks: 13
Thanked 18 Times in 12 Posts
Default

Thats the price you pay for quality and having someone else do it all for you.
__________________
MEANSTREETS PERFORMANCE

Dealer for
ACCUAIR rideheight control systems
ENTROPY RADIATORS XXX radiators for your pro-touring vehicle
FORGELINE MOTORSPORTS Highline custom 3 piece wheels
WEGNER AUTOMOTIVE Custom engines and LSX drive systems
SPEEDTECH PERFORMANCE Bay Area stocking dealer

NEVER FORGET -11
Reply With Quote
  #22  
Old 05-08-2012, 05:58 PM
Track Junky's Avatar
Track Junky Track Junky is offline
Senior Member
 
Join Date: Apr 2010
Posts: 3,469
Thanks: 2
Thanked 12 Times in 7 Posts
Default

So whats included in the price of the 40x60x16 metal building?

Freight costs to deliver to your property? Construction of building?
__________________
Gaetano Cosentino
Reply With Quote
  #23  
Old 05-09-2012, 03:26 PM
DRJDVM's '69's Avatar
DRJDVM's '69 DRJDVM's '69 is offline
Senior Member
 
Join Date: Jul 2004
Location: Manteca, CA
Posts: 1,299
Thanks: 2
Thanked 48 Times in 26 Posts
Default

That $20-25k is the building materials delivered..... No construction labor. Most of the buildings can be assembled by at DIY guy with basic skills and time. Or you can pay to have it assembled

You can find them under $20k but like anything there are differences in design and quality and what you want for "bells and whistles"

The metal building is a totally different animal than a stick built building that is nicely finnished etc.... So it is an "apples to oranges" comparison.... Plus the DIY vs hire all the labor makes a big difference too...I just didn't realize that going rate was that high in CA
Reply With Quote
  #24  
Old 05-09-2012, 04:46 PM
Track Junky's Avatar
Track Junky Track Junky is offline
Senior Member
 
Join Date: Apr 2010
Posts: 3,469
Thanks: 2
Thanked 12 Times in 7 Posts
Default

Unless your doing the slab yourself 2400 sf will cost you between $8-$10/sf.

So say $20K for slab, $25K for building delivered and then you have building costs with the addition of renting a Gradall or Sky Trak with say a 28' reach because a 16' would be the next size down in a loadall and you have 16' walls. In order to set 16' coloumns you'll need longer than 16' lift height which would be something like a model 5028 for say 4 weeks to set coloumns, horizontals, beams, trusses. Send the Sky Trac back, surround building with scaffolding and start siding. Siding complete, bring Sky Trac back and load roof. Not familiar with structure so I couldn't tell you how long you would need Sky Trac. Could be one day, could be a week. Then you have to rent scissor lift for any work in the building thats up high such as electrical and insullation, vent for plumbing....
I'm thinking 70K without seeing any drawings.
__________________
Gaetano Cosentino

Last edited by Track Junky; 05-09-2012 at 04:52 PM.
Reply With Quote
  #25  
Old 05-09-2012, 08:23 PM
pokey64's Avatar
pokey64 pokey64 is offline
Senior Member
 
Join Date: Sep 2009
Location: Iowa
Posts: 425
Thanks: 0
Thanked 1 Time in 1 Post
Default

We built a 40x100x12 steel building/farm shop for a customer last year. It was $114,000 all in. Steel building package delivered, insulation, bottom 8' of interior lined with steel, labor, equipment, concrete, electrical, plumbing, overhead doors...

My own stick built 1000 sqft detached garage built to match our house was in the $46/sqft range with a good amount of outside cocnrete. We poured the footings and did the plumbing ourselves. The rest was hired done.

It's not CA so a little off topic but maybe gives guys in the upper midwest an idea of cost if they read this thread.
__________________
//Ed
//1964 Impala SS
//1966 Chevelle (Family Hauler)
//1969 Camaro (Hers...)
Reply With Quote
  #26  
Old 05-09-2012, 10:01 PM
TheJDMan's Avatar
TheJDMan TheJDMan is offline
Senior Member
 
Join Date: Jan 2011
Location: Northern Virginia
Posts: 690
Thanks: 5
Thanked 25 Times in 13 Posts
Default

Just my comment, when you build go with a minimum 12ft ceiling. This will give you the headroom to install a lift at a later date.
__________________
Steve Hayes
"Dust Off"
68 Camaro
Speed has never killed anyone. Suddenly becoming stationary, that's what gets you!
"Jeremy Clarkson"
Reply With Quote
  #27  
Old 05-09-2012, 10:32 PM
camcojb's Avatar
camcojb camcojb is offline
Administrator
 
Join Date: Jul 2004
Location: Wilton, CA.
Posts: 12,900
Thanks: 5,543
Thanked 1,592 Times in 714 Posts
Default

Quote:
Originally Posted by TheJDMan View Post
Just my comment, when you build go with a minimum 12ft ceiling. This will give you the headroom to install a lift at a later date.
yep.
__________________
Jody

PAST CAR PROJECTS

Like Lateral-G on Facebook!

Follow Lateral-G on Instagram!

SPECIAL THANKS TO:
Jacob Ehlers and Amsoil for the lubricants and degreasers for my 70 Chevelle project
Shannon at Modo Innovations for the cool billet DBW bracket
Roadster Shop for their Chevelle SPEC Chassis
Dakota Digital for their Chevelle HDX Gauge Package
Painless Performance for their wiring harness

Ron Davis Radiators for their radiator and fan assembly.
Baer Brakes for their front and rear brakes

Texas Speed and Performance for their 427 LS Stroker
American Powertrain for their ProFit Magnum T56 kit
Currie Enterprises for their 9" Third Member
Forgeline for their GF3 Wheels
McLeod Racing for their RXT street twin clutch
Ididit for their steering column
Holley for their EFI and engine parts
Lokar and Clayton Machine for their pedals and door and window handles
Morris Classic Concepts for their 3 point belts and side mirrors
Thermotec for their heat sleeve and sound deadening products
Restomod Air for their Tru Mod A/C kit
Mightymouse Solutions for their catch can
Magnaflow for their 3" exhaust system
Aeromotive for their dual Phantom fuel system
Vintage Air for their new Mid Mount LS front drive
Hydratech Braking for their hydroboost system
Borgeson for their stainless steering shaft and u joints
Eddie Motorsports for their hood and trunk hinges and misc parts
TMI Products for their seats, door panels, and dash pad
Rock Valley Antique Auto Parts for their stainless fuel tank
Reply With Quote
  #28  
Old 05-10-2012, 12:56 AM
Track Junky's Avatar
Track Junky Track Junky is offline
Senior Member
 
Join Date: Apr 2010
Posts: 3,469
Thanks: 2
Thanked 12 Times in 7 Posts
Default

Quote:
Originally Posted by pokey64 View Post
We built a 40x100x12 steel building/farm shop for a customer last year. It was $114,000 all in. Steel building package delivered, insulation, bottom 8' of interior lined with steel, labor, equipment, concrete, electrical, plumbing, overhead doors...

My own stick built 1000 sqft detached garage built to match our house was in the $46/sqft range with a good amount of outside cocnrete. We poured the footings and did the plumbing ourselves. The rest was hired done.

It's not CA so a little off topic but maybe gives guys in the upper midwest an idea of cost if they read this thread.
Not to far off considering you did some of the work yourself. Just out of curiosity, how long does it take you midwest boys to put up 1000 sf?
__________________
Gaetano Cosentino
Reply With Quote
  #29  
Old 05-10-2012, 01:14 AM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,079 Times in 387 Posts
Default

Build your own! I did!







Reply With Quote
  #30  
Old 05-10-2012, 01:25 AM
GregWeld's Avatar
GregWeld GregWeld is offline
Lateral-g Supporting Member
 
Join Date: Jul 2005
Location: Scottsdale, AriDzona
Posts: 20,741
Thanks: 504
Thanked 1,079 Times in 387 Posts
Default

This will show up at your house!












Make sure you rent one of these!











And one of these!











So you can take cool pics like this!





Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:40 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright Lateral-g.net