Time for another update. Took a bit of time off of work for the holidays and managed to get a bit accomplished. I'm really close on the body where I have all of the rough metal work finished and need to spray some epoxy before I start using the filler. But, with this unbelievably cold weather it will take me forever to heat up the garage.
For this update, I've done the following:
-Fabricated brackets for the fuel cell cage and mounted it to the frame. When doing this, there was really one thing I wish I had...A good working knowledge of geometry. I guess there is a reason that I wasn't a mathematician

. Even with my weak skills I had just enough metal for fabricate the brackets. I planned on using a fuel cell remote filler but, when I received it, figured out it was just too big to fit in the original filler pocket so, I'll make the original filler neck work.
-Made a cover for the fuel cell to replace the metal I had to cut out of the trunk. Surprisingly, I did it correctly on the first time and didn't waste half a sheet of steel like I've done a time or two before.
-Lastly, I mounted my throttle pedal. I was originally planning on welding some studs to the firewall but, with the tight clearances, it made more sense to attach it to the master cylinder and steering column backing plate.
Next step is to mount the vintage air mock up unit and install the rivnuts for the fuel cell cover.