Got some framing lumber delivered today. They will be here tomorrow to start the framing.

Doesn't look like much does it.
We also had the engineer from the electric company come by and tell us where we could put the temp power for the house. It had to be moved because it would run right over the garage roof which is a no no. They did let me put a single temp service where I thougt we would need two poles. As long as the inspector alows it run on the ground in PVC temporarlly.
I'm going to try out the work the doctor did on my heart today. I'm going to try to dig the hole for the temp service. Ofcorse its raining. I'll have some pictures tomorrow.