...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 07-09-2009, 07:14 PM
-Freak-'s Avatar
-Freak- -Freak- is offline
Senior Member
 
Join Date: Feb 2007
Location: Hutchinson, MN
Posts: 169
Thanks: 0
Thanked 0 Times in 0 Posts
Default

We got a few more things done. I'm pretty freakin lucky to have a buddy that's so damn good at fabricating with minimal tools.

Throttle kickdown bracket.


Flange brace


New aluminum radiator and shroud.
Radiator is 19 x 22. 16" Electric fan moves 2200cfm.
The shroud was for a 19 x 26 radiator that had to be reworked to fit this one.


B&M has been installed and the manual steering column and steering sector are in. Also put in a temporary bucket seat until I get the dough for the ones I want.


Had to cut a speed hol for the carb hat to clear.
6 pack hood scoop will be getting installed.


Still have to finish the cold side and a lot of other things but the list is getting smaller fast.

__________________
1970 PT Dart - In progress
1971 Turbo Dodge Dart - Sold

Last edited by -Freak-; 07-09-2009 at 07:17 PM.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 03:17 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net