...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-01-2019, 11:09 AM
1970RT's Avatar
1970RT 1970RT is offline
Lateral-g Supporting Member
 
Join Date: Apr 2017
Location: Dallas, TX
Posts: 89
Thanks: 38
Thanked 48 Times in 42 Posts
Default

Happy new year. Let's catch up.

The torque boxes are expanded slightly, and taper down to interface with the inner chassis supports. This is all .075" 14ga, as there's already plenty of 1/8" in the rockers and torque boxes.




Closed in, and I'm holding off on welding and blending until I get the inner chassis members measured, tacked, and ready.




A good view of my office for the last few days.


Before I can measure for the inner chassis members, or even the rear suspension, the engine and trans have to be placed.


As we looked at earlier, the engine needs a deep setback to achieve the desired weight balance. It may come forward an inch or two from this position, but the shifter location is already close to ideal (for me).


The assembly is offset to the passenger side by 1/2".


Next up: fabricating the inner chassis members and motor and transmission mounts.

David

Last edited by 1970RT; 01-01-2019 at 11:12 AM.
Reply With Quote
The Following User Says Thank You to 1970RT For This Useful Post:
syborg tt (10-28-2019)
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 06:32 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net