...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 08-04-2011, 05:34 PM
Big-Head Big-Head is offline
Senior Member
 
Join Date: Jan 2009
Location: Lincoln, Ca
Posts: 172
Thanks: 0
Thanked 0 Times in 0 Posts
Default

Love the attention to detail. Very, very nice job. Looks great man!



Quote:
Originally Posted by waynieZ View Post
Thanks Guys.
Jay The axles had to be re ordered and haven't come in yet they were the wrong spline count. When they come in he will make it a roller and set all the gaps. I have a few old pictures of when it was going together. I'll post a few.

Some powder coated hard ware.

floor clamped for spot welding.

Install pictures of Air Bar bolted in ready for final install and Cut outs and install of DSE connectors.










Roof to quarter welds




The whole tub
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 02:48 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net