...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #32  
Old 09-15-2011, 05:12 AM
ParkerRS's Avatar
ParkerRS ParkerRS is offline
Member
 
Join Date: May 2008
Posts: 78
Thanks: 0
Thanked 1 Time in 1 Post
Default

Thanks for the comments guys. I'm heading out to the body shop Friday. The firewall was finished yesterday and will be getting sprayed today.

The exhaust is back from being ceramic coated along with the sub-frame and rear housing which had to be re-powdercoated. After welding the down bars to the front along with tie down brackets the front needed to be re-done. The rear housing was also modified for the sway bar so it also needed re-coating.

I'll have some fresh update pics by the weekend. This will be something new compared with the last year, fast progress!

P.S. You can get up off of the floor now Scottie!! LOL
__________________
Tommy

1973 Camaro - Fast burn 385, baer, hotchkis, hydraboost, 700r4, vintage wheelworks v-45s, finished 2007
1972 Camaro - Project Fool's Gold - LD 3-link, DSE sub-frame, LS2 stroked to 402, TKO 600, In progress
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 07:52 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net