...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 03-23-2012, 06:14 PM
makoshark makoshark is offline
Senior Member
 
Join Date: Jun 2005
Location: Byhalia, MS
Posts: 726
Thanks: 0
Thanked 0 Times in 0 Posts
Default

This is a picture of the bracket bolted in. I still have to add one more plate with 3 more nuts welded to it. The plate that I have not made yet has to be installed after the bracket is made and installed. You bolt it in and then weld the plate to the lower part of the bracket and then your done. I will drill a few holes randomly to plug weld the bracket to the frame once I have it finished and am ready to close the frame rail back up.
Attached Images
    
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:37 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net