...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #29  
Old 09-12-2012, 11:17 AM
frankv11's Avatar
frankv11 frankv11 is offline
Senior Member
 
Join Date: Dec 2009
Location: socal
Posts: 963
Thanks: 0
Thanked 28 Times in 17 Posts
Default


just getting done with alternator bracket to clear DSE sub at stock location, If any one is interested on it its done using a 2001 ls1 alternator bracket, get block side of bracket and mill out .937" ( to move alternator in to center up belt ) , will also need to grind a small section where the part # is located to clear timing cover, some more minimal grinding on alternator 10 oclock position bolt. all theres is to do now work on side bracket which seems straight forward.
.937 is my math with an ls6 from ctsv so it may be different for others but is doable using all GM parts

other pic of E brake set up and it clears 3.5" aluminum drive shaft. it was a pain in the butt got it to work.patch work is done but top pic is an older one



also working on shoulder belt set up

Last edited by frankv11; 09-12-2012 at 11:41 AM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 04:18 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net