...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #34  
Old 03-10-2013, 02:20 PM
57hemicuda's Avatar
57hemicuda 57hemicuda is offline
Senior Member
 
Join Date: Dec 2005
Location: Maryland
Posts: 865
Thanks: 1
Thanked 49 Times in 25 Posts
Default

Started making the tubs today, kind of an engineering challenge due to the removable body, and the rollbar tubing passing right through the middle of the tub. The tubs will stay with the body when removed, the floor with the chassis. Got the sides and rail built still need to make the wrap around part.















Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 07:45 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net