...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 02-28-2005, 10:53 PM
Camaro Zach's Avatar
Camaro Zach Camaro Zach is offline
Member
 
Join Date: Feb 2005
Location: Houston TX
Posts: 26
Thanks: 0
Thanked 0 Times in 0 Posts
Default

A little update: quarter panels are about 3/4 of the way completely welded down, and the wheel tubs are about 1/2 way welded down. Shouldn't be too long before the rear sheetmetal is done. BTW its taking so long because i have been building 110 feet of hand rails with complicated ballistors for our 2nd house
__________________
AIM: Zachary188

'68 Camaro: www.cardomain.com/id/43zach
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 02:07 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net