...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 09-12-2006, 07:38 PM
Steve1968LS2's Avatar
Steve1968LS2 Steve1968LS2 is offline
Moderator
 
Join Date: Feb 2005
Location: Anaheim Hills, CA
Posts: 5,534
Thanks: 0
Thanked 4 Times in 2 Posts
Default

Quote:
Originally Posted by rockdogz
Ok, that's not even fair... you should have cut off a few wires just to make it interesting...

Looking great, BTW!!
I was worried about the wires.. anyone that knows these modern engines knows what a birds nest it can be. The speartech harness was very clean and while it's not wired like a showcar with every wire dress and placed just so it still looks very clean. the main harnesses tucked in nice between the Katech coil racks and the FAST fuel rails.

Installed the AFCO radiator, catch can and relay. Needed fittings so we got sorta stuck on the fuel system. Soooooo close

This was the hardest fitting so far.. what a PITA..
Attached Images
 
__________________
"A ship in port is safe, but that's not what ships are built for."

See Bad Penny run the cones: https://www.youtube.com/watch?v=8GUPPIX-92U

1971 Chevelle Wagon - Roadster Shop Chassis ProCharged Shafiroff LS and lots of yada yada

1968 Camaro - Project Track Rat - 440 RHS LS

Last edited by Steve1968LS2; 09-12-2006 at 07:41 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:47 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net