...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 08-03-2018, 07:40 AM
jh99 jh99 is offline
Senior Member
 
Join Date: Dec 2004
Posts: 143
Thanks: 4
Thanked 5 Times in 5 Posts
Default

All of the wiring is being cleaned up and finished right now.

[IMG]Dash 3 by Jeremy Haddox, on Flickr[/IMG]

A peak of the engine. This pic is a week or so old. I changed the fuel rails and a couple of more minor details.

[IMG]Engine install 3 by Jeremy Haddox, on Flickr[/IMG]

Even though the exhaust is stainless, I had it coated for cooling and cleaning purposes. It is almost time to fire the engine for the first time.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:57 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net