...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old 06-17-2007, 09:38 PM
James OLC's Avatar
James OLC James OLC is offline
Senior Member
 
Join Date: Jan 2006
Location: Calgary, AB
Posts: 1,459
Thanks: 0
Thanked 1 Time in 1 Post
Default





I hope to have the rest of the front end together over the course of the week. We'll mock up the engine and dry sump as soon as the parts arrive and with some luck have the front end together.

Our Stainless tank from Rick's Stainless arrived Friday (thanks Rick ) and we will get it mounted when we get the car back on a lift. Then we can figure out how we are going to mount the exhaust, rear end cooler, and plumbing for the brakes and traction control. It's kind of busy back there:



Thanks again to all of our sponsors for their help in getting us to this point - American Touring Specialties, Lateral Dynamics, Heighton Restorations, Ididit, Inc., Tiltion Engineering, and Rick's Stainless. Also, thanks to Midnite Octane and Lateral-G Webdesign. All of these vendors are top notch organizations.

The fun is really starting so stay tuned, there will be more soon.
__________________
James
1967 Camaro RS - The OLC
1967 Camaro RS - Recycler
1969 Camaro - Dusty

Last edited by James OLC; 06-17-2007 at 09:41 PM.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:40 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net