...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Open Discussion
User Name
Password



View Poll Results: Least favorite portion of the build process
Wiring 10 7.81%
Fabrication 1 0.78%
Paint/Body 32 25.00%
Suspension 1 0.78%
Install Engine/Tranny 1 0.78%
Interior Work 2 1.56%
Paying for it! 32 25.00%
Waiting for it 22 17.19%
Working the bugs out 13 10.16%
Plumbing 2 1.56%
Decisions 12 9.38%
Voters: 128. You may not vote on this poll

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #5  
Old 03-18-2010, 12:57 AM
Flash68's Avatar
Flash68 Flash68 is offline
Moderator
 
Join Date: Sep 2005
Location: NorCal
Posts: 9,180
Thanks: 58
Thanked 159 Times in 105 Posts
Default

Waiting for it by far.... my life changed for the good, the bad, back to good, and then to bad by the time the car was done.
__________________
2004 NASA AIX Mustang LS2 #14
1964 Lincoln Continental
2014 4 tap Keezer
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 09:17 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net