Thanks for the kind words guys...it's much appreciated!!

Brent, the late nights have already begun! We built this house 11.5 years ago and I never finished the garage. So now with time running out and the car heading home I find myself out there a lot! The cabinets have all been relocated to what I think will make for a much safer storage space for Karma, I did lose some counter top space...but I will be fine with what’s left! I cut a door into the parts room from the garage so I don't have to access it from outside anymore! Remember it rains here a lot! I finally have all the drywall finished, smooth wall finish (no texture) as that’s what I do for a living. Two of the bays are painted and I'm priming the 3rd this weekend. Hope to have it all painted by next weekend! It’s kinda time consuming as the ceilings are white and the walls are a light canvas color. Then I need to plumb the sink, trim out the new door, and wash the floor one more time....then we are ready for Karma's homecoming!!

I’ll post before and after pics of the garage when I’m finished…
__________________
Tony
'68 Camaro
  #2  
Old 11-20-2010, 10:11 AM
Spiffav8's Avatar
Spiffav8 Spiffav8 is offline
Lateral-g Moderator
 
Join Date: Apr 2007
Location: Las Vegas, NV
Posts: 4,740
Thanks: 583
Thanked 462 Times in 220 Posts
Default

Quote:
Originally Posted by awr68 View Post
Thanks for the kind words guys...it's much appreciated!!

Brent, the late nights have already begun! We built this house 11.5 years ago and I never finished the garage. So now with time running out and the car heading home I find myself out there a lot! The cabinets have all been relocated to what I think will make for a much safer storage space for Karma, I did lose some counter top space...but I will be fine with what’s left! I cut a door into the parts room from the garage so I don't have to access it from outside anymore! Remember it rains here a lot! I finally have all the drywall finished, smooth wall finish (no texture) as that’s what I do for a living. Two of the bays are painted and I'm priming the 3rd this weekend. Hope to have it all painted by next weekend! It’s kinda time consuming as the ceilings are white and the walls are a light canvas color. Then I need to plumb the sink, trim out the new door, and wash the floor one more time....then we are ready for Karma's homecoming!!

I’ll post before and after pics of the garage when I’m finished…
Man I'd be excited to be working on that stuff knowing that Karma is on the way. Perfect way to get rid of all that nervous energy you must have built up. Seriously...stop complaining.

__________________
Curtis
Pilots: We're not better than you, just way cooler.

NO ONE IS COMING. IT'S UP TO US.

http://www.navysealfoundation.org/
  #3  
Old 11-20-2010, 10:45 AM
DOOM's Avatar
DOOM DOOM is offline
Lateral-g Supporting Member
 
Join Date: Jan 2007
Location: South Side Chicago
Posts: 2,912
Thanks: 7
Thanked 64 Times in 40 Posts
Default

Quote:
Originally Posted by awr68 View Post
Thanks for the kind words guys...it's much appreciated!!

Brent, the late nights have already begun! We built this house 11.5 years ago and I never finished the garage. So now with time running out and the car heading home I find myself out there a lot! The cabinets have all been relocated to what I think will make for a much safer storage space for Karma, I did lose some counter top space...but I will be fine with what’s left! I cut a door into the parts room from the garage so I don't have to access it from outside anymore! Remember it rains here a lot! I finally have all the drywall finished, smooth wall finish (no texture) as that’s what I do for a living. Two of the bays are painted and I'm priming the 3rd this weekend. Hope to have it all painted by next weekend! It’s kinda time consuming as the ceilings are white and the walls are a light canvas color. Then I need to plumb the sink, trim out the new door, and wash the floor one more time....then we are ready for Karma's homecoming!!

I’ll post before and after pics of the garage when I’m finished…
Tony .................. You had 9 years to finish this!!!
__________________
Mario
USCOLLISION
  #4  
Old 11-20-2010, 11:04 AM
awr68's Avatar
awr68 awr68 is offline
Senior Member
 
Join Date: Dec 2004
Location: Oregon
Posts: 6,478
Thanks: 0
Thanked 3 Times in 3 Posts
Default

Quote:
Originally Posted by DOOM View Post
Tony .................. You had 9 years to finish this!!!
I knew you would bust my chops!

Actually one of the many excuses I have used is that I didn't want to make it pretty until I was done with the dirty/fab stage of the build! And man did the grinding dust go everywhere! But now that that's all far behind us it's time to dial in the room like Pete did the car! He kinda set the bar high...
__________________
Tony
'68 Camaro
Closed Thread

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 12:17 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net