...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #22  
Old 09-14-2014, 07:51 PM
gerno's Avatar
gerno gerno is offline
Senior Member
 
Join Date: May 2005
Location: Austin, TX
Posts: 526
Thanks: 0
Thanked 5 Times in 5 Posts
Default

More progress made over the weekend. Short block is together with only a little time needed to finish the engine build.

Name:  image-5.jpeg
Views: 383
Size:  85.2 KB

Name:  image-3.jpeg
Views: 386
Size:  112.5 KB

Name:  image-4.jpeg
Views: 396
Size:  111.5 KB


I also think I made more progress with the accessory drive. I think I'm going to try to reroute the belt like the truck setup and build my own manual belt tensioner. I'm a little worried about the clearance needed since the area under the TB and rear the radiator hose will be tight. Does anyone know a tolerance that is reasonable for whip in the belt in and out of load using a manual tensioner?


Name:  image-6.jpeg
Views: 399
Size:  119.2 KB

Name:  image-7.jpeg
Views: 419
Size:  129.9 KB
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 01:22 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright Lateral-g.net