...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



Reply
 
Thread Tools Display Modes
  #1  
Old 01-02-2008, 10:39 PM
customcam's Avatar
customcam customcam is offline
Senior Member
 
Join Date: Nov 2004
Posts: 980
Thanks: 0
Thanked 0 Times in 0 Posts
Default

hey Rodger man love your work and thanks for sharing it with us all
So its about 20k for the chassis and about 10ish for the Sheetmetal work rite?
Reply With Quote
  #2  
Old 01-03-2008, 07:04 AM
ironworks's Avatar
ironworks ironworks is offline
Senior Member
 
Join Date: Oct 2005
Location: Bakersfield, Ca
Posts: 5,155
Thanks: 4
Thanked 30 Times in 19 Posts
Default

Quote:
Originally Posted by customcam
hey Rodger man love your work and thanks for sharing it with us all
So its about 20k for the chassis and about 10ish for the Sheetmetal work rite?
It all depends on what you want. A four link is way easier then IRS, the smaller the car the more money, for obvious reasons. The lower the rideheight the more work it takes also. The sheetmetal work in Johns car has rounded corner wheels tubs with out side faces to attach to the quarter like stock, plus the floor panel fit in between bar which takes time.

The real money in these projects come in with the details, or all the small had fabbed parts, or trick one off parts. The other big chunk is proper sheetmetal work that is metal finished and nice. I love it when You do major sheetmetal work and the customer does not know where or how you did it.

Rodger
__________________
www.ironworksspeedandkustom.com
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 04:47 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net