...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #30  
Old 08-29-2009, 12:30 AM
rat_rod_russell's Avatar
rat_rod_russell rat_rod_russell is offline
Senior Member
 
Join Date: Sep 2008
Location: Luling TX @ Nerd Rods
Posts: 365
Thanks: 44
Thanked 18 Times in 9 Posts
Default Update Aug 29, 2009

Rear frame main rails are knocked out, that’s these parts.






The Front batch of laser parts came in, see the erector set frame on the table. I’ve tabbed and keyed everything to make them interlocking, they’re dropping together like a kids jig saw puzzle. That means all my geometry and angles I spent all that time working out with Solidworks and suspension analyzer will be duplicated in real life in a repeatable fashion.







Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:58 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net