So the work has begun. They started making the floor, and they are fitting the front sheetmetal to begin core support fabrication and to terminate the frame ends. Not much to see, but at least it is in the big area with all the other cars again; I hope it plays nice with the other children.
The drivers side floor begins construction:
My dream engine that I can't afford:
The sheetmetal getting installed:
Fenders in place, getting ready to mock up the 50/50 signature front air dam:
More of the floor installed, and some panels on the passenger side:
Rodger tells me that he might be checking my HRE wheels on the chassis later. I am really excited to see it when it is off the table, wheels and sheetmetal in place and a roller again. What a day that will be.
Tyler