...

Go Back   Lateral-g Forums > Lateral-G Open Discussions > Project Updates
User Name
Password



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old 01-29-2011, 02:59 PM
johnnymac46's Avatar
johnnymac46 johnnymac46 is offline
Senior Member
 
Join Date: May 2010
Location: Virginia Beach, VA
Posts: 313
Thanks: 1
Thanked 14 Times in 12 Posts
Default

Its been a while since I have updated..

since my last post i have assembled the front suspension, minus the steering linkage which a buddy of mine is sandblasting some the parts.





I started on the mini tubs, i have one mocked up it still needs some trimming and fine tuning. I still have to cut the floor for the right tub, I began to remove the frame rails for the AME rear which I should have this week.





Im going to wait to weld the tubs in until i get the suspension in. I am still debating if i can save the quarters or if i just want to replace them someone did a pretty terrible job of patching them. the outer wheelwells will definately need to be replaced.

Is there a way to roll the 1/4 lip without buying the 300 dollar tool im going to use one time and never touch again? ive been told that I will regret cutting them.



sorry for the bad pics I took them on my Iphone
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 03:02 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Lateral-g.net